A workflow for distributed parallel data analysis on HPC with checkpoint

A typical task we do nowadays is to submit a job to the cluster to run some data analysis. But there are some limitations we can do as I know, to some extend.

  1. Lots of tasks take a long time to run, which means the Walltime must be large even with multiple cores;
  2. HPC queue is busy and it takes forever to wait in the queue;
  3. If a job failed, we have to start over;
Therefore, I have designed a protocol with workflow to resolve these issues.
  1. It uses MPI for parallel computing, so we can make use of multiple nodes to speed up;
  2. It provides a checkpoint feature, so it can restart if something went wrong;
  3. It supports automate resubmit if the Walltime is not enough.

There are several implementations depending on the system. For example, on the SLURM system, a recurring job method can be used.

This design is expected to be able handle normal operations. However, there is a catch. It makes some assumption about the work load of individual slave node: it assumes that within each walltime, all the slave node should be able to finish the task. 

Normally, the slave node will receive only a small fraction of the whole task and finish it on time. However, if the work load is not uniform, i.e., some nodes may experience slow down whereas others are fast, this work could fail.

Ideally, the workflow should keep track of individual node status so we can restart failed ones easily.

A get around method would be Parafly. If we can physically decompose the task into individual tasks, it would be much easily to rerun some slaves.

Comments

Popular posts from this blog

Spatial datasets operations: mask raster using region of interest

Climate change related studies usually involve spatial datasets extraction from a larger domain.
In this article, I will briefly discuss some potential issues and solutions.

In the most common scenario, we need to extract a raster file using a polygon based shapefile. And I will focus as an example.

In a typical desktop application such as ArcMap or ENVI, this is usually done with a tool called clip or extract using mask or ROI.

Before any analysis can be done, it is the best practice to project all datasets into the same projection.

If you are lucky enough, you may find that the polygon you will use actually matches up with the raster grid perfectly. But it rarely happens unless you created the shapefile using "fishnet" or other approaches.

What if luck is not with you? The algorithm within these tool usually will make the best estimate of the value based on the location. The nearest re-sample, but not limited to, will be used to calculate the value. But what about the outp…

Numerical simulation: ode/pde solver and spin-up

For Earth Science model development, I inevitably have to deal with ODE and PDE equations. I also have come across some discussion related to this topic, i.e.,

https://www.researchgate.net/post/What_does_one_mean_by_Model_Spin_Up_Time

In an attempt to answer this question, as well as redefine the problem I am dealing with, I decided to organize some materials to illustrate our current state on this topic.

Models are essentially equations. In Earth Science, these equations are usually ODE or PDE. So I want to discuss this from a mathematical perspective.

Ideally, we want to solve these ODE/PDE with initial condition (IC) and boundary condition (BC) using various numerical methods.
https://en.wikipedia.org/wiki/Initial_value_problem
https://en.wikipedia.org/wiki/Boundary_value_problem

Because of the nature of geology, everything is similar to its neighbors. So we can construct a system of equations which may have multiple equation for each single grid cell. Now we have an array of equation…

Watershed Delineation On A Hexagonal Mesh Grid: Part A

One of our recent publications is "Watershed Delineation On A Hexagonal Mesh Grid" published on Environmental Modeling and Software (link).
Here I want to provide some behind the scene details of this study.

(The figures are high resolution, you might need to zoom in to view.)

First, I'd like to introduce the motivation of this work. Many of us including me have done lots of watershed/catchment hydrology modeling. For example, one of my recent publications is a three-dimensional carbon-water cycle modeling work (link), which uses lots of watershed hydrology algorithms.
In principle, watershed hydrology should be applied to large spatial domain, even global scale. But why no one is doing it?  I will use the popular USDA SWAT model as an example. Why no one is setting up a SWAT model globally? 
There are several reasons we cannot use SWAT at global scale: We cannot produce a global DEM with a desired map projection. SWAT model relies on stream network, which depends on DEM.…